CORFU
In 25 days, the WATT Group completed the construction of a new retaining wall at the Tebloni landfill, following extensive damage caused by extreme weather.
The project included the construction of a row of 27 bored piles, with a total length of approximately 200 meters, on which a reinforced concrete retaining wall was founded via a pile cap. The wall measured 1.00 m in width at the base and 0.40 m at the top, with a total length of 64 meters.
Special attention was paid to integrating the project into the landfill environment: the pile cap was constructed at an elevation that does not exceed the perimeter road, ensuring continued accessibility and the functionality of the fire protection zone.